---
title: How do I spot schedule delays and quality problems early with schedule analytics? | AEC Agents
url: https://aecagents.si/use-cases/schedule-health
description: Project controls software analyzes schedule updates for delays and quality issues.
last_modified: 2026-11-27
source: AEC Agents (free, open workflows; not engineering advice)
---

[AI assists](https://aecagents.si/use-cases/schedule-health#honesty-labels)Workflow guide · not independently tested

# How do I spot schedule delays and quality problems early with schedule analytics?

Project controls software analyzes schedule updates for delays and quality issues.

Role
:   [Project Manager](https://aecagents.si/roles/project-manager)

Discipline
:   Construction

Tools
:   SmartPM

Updated
:   27 November 2026

Tool links listed below; vendor features and pricing change, so confirm with the vendor.

## Short answer

Use Copilot in Excel or ChatGPT: Export the schedule to a sheet and have the AI flag open ends, constraints, negative float and long durations. Project controls software analyzes schedule updates for delays and quality issues. A person still checks: flags with the scheduler; some are intentional.

## AI tie-in

**Tool:** Copilot in Excel or ChatGPT

Export the schedule to a sheet and have the AI flag open ends, constraints, negative float and long durations.

### Prompt 1

```
This sheet is a schedule export (ID, name, duration, predecessors, successors, float, constraints). Flag activities with no predecessor or successor, hard constraints, negative float, and durations over 20 days, with a count per issue.
```

**Human check:** Flags with the scheduler; some are intentional.

## The problem

Spot schedule delays and quality problems early. This is a common, time-consuming task for a project manager.

## What this workflow does

Project controls software analyzes schedule updates for delays and quality issues.

**How it works:** AI drafts or analyzes. A person operates the tools, checks the work, and takes action.

**Your checkpoint:** Delay analysis for claims needs a qualified scheduling expert.

## Before you start

- Access to the named tool; confirm license, version and cost with the vendor.
- A small, non-confidential sample to try the workflow on first.
- A qualified person to review the output before it is used.

### Tools and access

- [SmartPM](https://smartpm.com/)

## Follow the steps

1. Upload each monthly schedule update.
2. Review delay and quality metrics.
3. Discuss flagged items in the OAC meeting.

## Try a small example

Replace the bracketed fields with your own project details. No tested sample run is published for this workflow yet.

### Sample input

```
Fill in the bracketed [fields] in the text below with your project data.
```

### Starter prompt

```
Write a one-page schedule narrative for the owner from these update notes: [paste notes]
```

### Expected output

```
Not published yet. Treat any output as a draft and check it against the source documents.
```

## Check the result

- Every value, citation or quantity traces back to a source document.
- Missing information is marked as missing, not filled in.

## Limits and recovery

- Delay analysis for claims needs a qualified scheduling expert.
- Check your organization’s data policy before sharing project files with third-party tools.

**Stop or switch when:** The source cannot be verified, permissions are missing, or the result contains unsupported facts.

## Frequently asked questions

How does AI help with this?

Copilot in Excel or ChatGPT: Export the schedule to a sheet and have the AI flag open ends, constraints, negative float and long durations. A person still checks: Flags with the scheduler; some are intentional.

How do I how do I spot schedule delays and quality problems early with schedule analytics??

Upload each monthly schedule update. Review delay and quality metrics. Discuss flagged items in the OAC meeting. The full step list is above.

Does this use an AI agent or regular software?

It is labeled AI assists: AI drafts or analyzes. A person operates the tools, checks the work, and takes action.

What tools do I need?

SmartPM. Confirm license, version and cost with the vendor, and try it on a small non-confidential sample first.

Has this workflow been tested?

Workflow guide · not independently tested. It is written from vendor documentation and practitioner use.

## Where to go next

- [How do I search project documents with AI to answer field questions, then confirm the source?](https://aecagents.si/use-cases/project-document-search)
- [How do I compare construction schedule scenarios with AI-assisted scheduling tools?](https://aecagents.si/use-cases/schedule-optimization)
- [How do I back-calculate submittal due dates from the schedule and send a weekly due-soon list?](https://aecagents.si/use-cases/submittal-due-dates-from-schedule)
- [All Project Manager workflows](https://aecagents.si/roles/project-manager)
- [All Field, quality and safety workflows](https://aecagents.si/tasks/field-safety)

## Evidence and maintenance

Written from vendor documentation and practitioner use. Labels apply to the steps described here, not every feature of a product. Links were checked when the page was written.

- [SmartPM (vendor site)](https://smartpm.com/)

## On this page

Start with a small sample and keep the original record open while you verify the result.

## How each workflow is labeled

Agent executes
:   An AI agent calls connected tools to carry out bounded actions. You set permissions and review the result.

AI assists
:   AI drafts or analyzes. A person operates the tools, checks the work, and takes action.

Conventional automation
:   Rules or specialist software perform the task. No AI agent is required.
